MMG Contracting Logo
Weston Road - King City

Weston Road - King City

Drainage solution project with rip rap and excavation.

Project Overview

Customer was facing water backup on the patio steps. MMG Contracting resolved it by redoing the drainage ditch, removing the old rip rap with a 20-tonne excavator and hauling in 60 tonnes of premium rip rap.

August 2023
King City, Ontario
residential
---

Project Highlights

  • Premium Rip Rap product by MMG Contracting
  • Heavy excavator for speed by MMG Contracting
  • In-house haulage solutions by MMG Contracting

Project Gallery

Project image 1 /images/Weston Road - King City 1.png MMG Contracting Canada
Project image 2 /images/Weston Road - King City 2.png MMG Contracting Canada
Project image 3 /images/Weston Road - King City 3.png MMG Contracting Canada

Project Videos

Request Similar Service

Interested in a similar project ? Contact us for a free quote and consultation.

Services Used

Drainage Excavation Rip Rap Installation