
Weston Road - King City
Drainage solution project with rip rap and excavation.
Project Overview
Customer was facing water backup on the patio steps. MMG Contracting resolved it by redoing the drainage ditch, removing the old rip rap with a 20-tonne excavator and hauling in 60 tonnes of premium rip rap.
August 2023
King City, Ontario
residential
---
Project Highlights
- Premium Rip Rap product by MMG Contracting
- Heavy excavator for speed by MMG Contracting
- In-house haulage solutions by MMG Contracting
Project Gallery


